29
Daily:
Wipe monorail with a cloth or non-abrasive scouring pad after use.
See page 30.
Every 50 hours of use
(weekly for institutional users):
Clean and lubricate the chain with the oil provided (or 20w Motor Oil
or 20w 3-in-1 oil). See page 30.
Every 250 hours of use
(monthly for institutional users):
1) Inspect chain for stiff links. If thorough lubrication does not help,
the chain should be replaced with Concept2 part number PN 1765.
2) Inspect chain-handle connection for wear. If the hole has become
elongated, or the U-bolt is worn halfway through, the entire con-
nection should be replaced with Concept2 part number PN 184.
3) Tighten the shock cord if the handle does not
return all the way to
the fan enclosure. See page 32.
4) Check the socket screws used to install the front leg for tightness.
5) Loosen or tighten the nuts on the Performance Monitor arm joints
as necessary. See page 35.
6) Check for dust inside flywheel with flashlight. Vacuum if needed.
See page 34.
Approximately
Every 800 Hours of Use:
Replace batteries in the Performance Monitor (PM2). The PM2 uses
2 AA batteries.
See page 35
.
IMPORTANT: The monitor is a sealed unit. Do NOT
take apart. Any attempt to disassemble will void war-
ranty. Contact Concept2 for problems with this part.
IMPORTANT SAFETY NOTE
Use of this machine with a worn or weakened part,
such as the chain, sprockets, swivel connector or
shock cord, may result in injury to the user. When
in doubt about the condition of any part, Concept2
strongly advises that it be replaced immediately.
Use only genuine Concept2 parts. Use of other
parts may result in injury or poor performance of
machine.
5
MAINTENANCE
Recommended Maintenance Schedule