EasyManua.ls Logo

CTX DZ33I - CTX Oven Installation; Shipping Damage Inspection

CTX DZ33I
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Side View Front View
SECTION 2 INSTALLATION
A. Inspect for shipping Damage
All shipping container should be examined for
damage before and during unloading. This
equipment was carefully inspected and
packaged at the factory. The freight carrier has
assumed responsibility for its safe transit and
delivery. If equipment is received in damaged
condition, either apparent or concealed, a

Related product manuals