32
Production output for any pan size can be easily calculated using the following formula:
This formula is based on a succession of single pans being placed on the belt. No consideration is given to multiple pans
across the 18” wide belt nor to staggered loading. The hourly production rate obtained by the above calculation must be
multiplied by a factor equal to the number of pans placed across the belt.
3. Production Capacity Charts
The production output figures shown below are based on using round pans in the various sizes shown. These figures
reflect output.
Model DZ33I Series Oven
D. Time and Temperature Guide
Figure 3-7