EasyManua.ls Logo

Datcon DT9502 - Mounting Procedure

Datcon DT9502
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DT9502
20171205-V3
11
4.3. Mounting procedure
Preparatory steps
1. Cut-out the panel according to the figure shows below.
The cut-out needs special tools, it must be carried out by
trained specialist personnel.
Cut-out dimensions
2. Put on the enclosed seal onto the instrument case from
the rear side and fit it to the instrument front panel back
side.
3. Put the instrument into the prepared cut-out until it
possible and check the fitting of the seal between case and
mounting surface.

Table of Contents