EasyManua.ls Logo

Datex-Ohmeda Avance - Machine Check - Circuit O2; Machine Check - Monitor

Datex-Ohmeda Avance
222 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Preoperative tests
M1204616 5-7
4. (ACGO option only.) Set the ACGO switch to Circle.
5. Select Start. The display shows the checks being run.
• The system beeps when the check is done.
• The results are shown on the display.
6. When the check passes, the next check starts.
Machine check -
circuit O2
The Machine Check-Circuit O2 check measures the O2%.
1. Open the patient Y.
2. Set the Bag/Vent switch to Vent.
3. (ACGO option only.) Set the ACGO switch to Circle.
4. The display will show the O2%. Do not select Done when 21 is
first displayed. Allow the reading to stabilize, then select Done.
Calibrate the O2 cell if necessary.
Machine check -
monitor
When External Gas Monitor is set to Yes by the Super User, the
Machine Check-Monitor check occurs. This check is not a test. This
check is a reminder to connect a respiratory gas monitor.

Table of Contents