EasyManua.ls Logo

de Jong Duke Virtu - Core Operational Procedures

de Jong Duke Virtu
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Procedure
Procedure
Procedure
5.6 Preventive maintenance procedures
5.6.1 Switch on
Perform the following steps:
1. Turn on the water supply.
2.
Connect the power cord to the power mains socket.
3.
Open the door (on page 46).
4.
Switch the [ON/OFF] power switch to the ON position.
check the inside view drawing (see on page 17) for the
precise location.
5.
Close the door (on page 46).
6.
The coffee machine will start up.
7.
The main screen is displayed with the message 'filling boiler'
and then 'heating boilers' in the message area (see on page
21) on the screen.
NOTE
If the door was left open for too long the service menu
is shown.
Tap the [Exit] button and then the [Close door and
press here to quit service] button to leave the
Service menu.
8. After a few minutes the message 'heating boilers' disappears
and the machine is ready for use.
5.6.2 Open the door
Perform the following steps:
1.
Insert the key in the lock of the door of the coffee machine.
2.
Turn the key 90 degrees.
3.
Open the door.
The Service menu is displayed on the screen.
NOTE
Do not leave the door open unattended to prevent
unauthorized access to the inside of the machine.
5.6.3 Close the door
Perform the following steps:
1. Insert the key in the lock of the door of the coffee machine.
Virtu CEC Medium Cabinet 70/90 CoEx® brewer User Manual 5DUCEK20M EN V2.1
46

Table of Contents

Related product manuals