Home
Deger
Antenna
D25H
Page 10 (Scope of Delivery)
Deger D25H - Scope of Delivery; Scope of Delivery of the Degertracker
43 pages
Manual
Save Page as PDF
To Next Page
To Next Page
To Previous Page
To Previous Page
Loading...
01.01.2022
ASSEMBLY AND OPERATING MANUAL DE
GER
D25H
, D60H,
D80 and D100
Page
10
2.4
Scope of delivery
2.4.1
Scope of delivery of the
DEGER systems
7
6
5
4
8,9,10
27
22,23,24
11,12,13
1,2,3
21
22,23,24
15,16,17
18,19,20
12,14
19,20
9
11
Table of Contents
Main Page
Table of Contents
3
Abbreviations
5
General
6
Introduction
6
Fundamental Safety Notes
6
Liability Disclaimer
6
Symbols Used
7
Representation Rules
7
Enumerations and Instructions for Actions
7
Notes on Safety
7
Product Description
8
Short Description of the Degertracker
8
Product Identification
8
For Your Safety
8
Intended Use of the Degertracker
8
Personal Protective Equipment
8
Safety Notes
9
Qualification of Persons
9
Scope of Delivery
10
Scope of Delivery of the Degertracker
10
Accompanying Documentation
12
Optional Accessories
12
Performances to be Rendered by the Customer
12
Material to be Provided by the Customer
12
Machines to be Provided by the Customer
13
Technical Data
13
Climatic Conditions According to DIN en 50178:1998-04
13
Permitted Tolerances
13
Unloading and Intermediate Storage
14
Unloading from Truck
14
Notes on Unloading
14
Dimensions and Weights
14
Intermediate Storage
14
Abridged Assembly Instructions for the Degertracker
15
Preparations for the Degertracker Assembly
16
Notes for Preparing the Foundation
16
Steel Foundation
16
Mast with Wall Flange
16
Concrete Foundation
16
Creating Concrete Foundation
17
Assembly of the Degertracker
18
Assembling the Base Frame
19
Assembling the Aluminum Profiles
21
Further Preparation
22
Mounting to the Mast
23
Assembling the Elevation Drive (EMO)
24
Assembly of Energy Converter 6 (EC-6)
24
Assembly of Modules
25
Clamping between Modules
26
Clamping at End of Module Surface
26
Preparation to Connect the MLD-Control to the Electrical Installation of the Customer
27
Boomerang
27
Grounding the System
28
Connecting the Elevation Drive
28
Overview of Cable Routing through the Gearbox Cover Plate
29
Assembly of MLD-Sensors
30
Install MLD Control System
31
Connection Diagram
31
Overview
32
Commissioning
33
Inspection for Free Movement
33
Initiate the Inspection for Free Movement
33
Scope of the Inspection for Free Movement
33
Declaration of Obligation on Liability for Material Defects
34
Optional Accessories
35
Holding Plate for Junction Box on Mast
35
Holding Device for Inverter on the Rotating Head
35
Cleaning and Maintenance
36
Cleaning
36
Maintenance
36
Commodities
36
Spare Parts
37
Spare Parts Catalogue
37
Contact Information for Degerenergie Headquarters
37
Troubleshooting
38
Fault Message
39
Appendix
40
Declaration of Conformity
40
Taking the Degertracker out of Service
41
Disassembly
41
Waste Disposal
42
Publisher Information
43