CHAPTER 3
DLm8500 with Data Domain Physical Planning
This chapter covers the tasks to be completed when planning an installation of the
DLm8500 with Data Domain (DD) system at the customer site.
l
DLm8500 with DD Physical Planning Overview..................................................20
l
Installing the DLm VTEC hardware into a third-party rack in the field................ 27
l
DLm8500 DD Configuration and Host Connectivity........................................... 29
l
DLm power requirements....................................................................................31
l
External network requirements.......................................................................... 33
Disk Library for mainframe Physical Planning Guide for DLm8500 19