29
Chapter 6 Installation
3
Carefully lift the whole unit upright
4
with the Delta logo nameplates and the
icons shown on the panels facing up.
Lift Up 90˚
BATTERY PACK
ESC
ESC
BATTERY PACK
Delta Logo
Nameplate
× 2
Panel
× 2
Facing Up
(Figure 6-6: Place the Whole Unit Upright)
4
Place the whole unit inside the tower stands
5
.
ESC
BATTERY PACK
ESC
BATTERY PACK
5
(Figure 6-7: Place the Whole Unit inside the Tower Stands)
Leave adequate space (at least 50 cm) around all sides of the unit for good
ventilation.
NOTE :
A minimum of two people are required to execute
3
and
4
.