DG-GS1528HP/C User Manual
3
2 Hardware installation
This chapter provides unpacking and installation information for the Web Managed PoE switch.
First step: open a seal
Open the shipping carton and carefully unpack its contents. Please consult the packing list located in the User Manual
to make sure all items are present and not damaged.
Switch 1pcs
AC power cord 1pcs
Rubber feet 4pcs
Screws 6pcs
Mounting brackets 2pcs
User manual/CD 1pcs
If any item is found missing or damaged, please contact the local reseller for replacement.
Second step: switch installation
For safe switch installation and operation, it is recommended that you:
Visually inspect the power cord to see that it is secured fully to the AC power connector.
Make sure that there is proper heat dissipation and adequate ventilation around the switch.
Do not place heavy objects on the switch.
Desktop or Shelf Installation
When installing the switch on a desktop or shelf, the rubber feet included with the device must be attached on the
bottom at each corner of the device's base. Allow enough ventilation space between the device and the objects
around it.
Rack Installation
The switch can be mounted in an EIA standard size 19-inch rack, which can be placed in a wiring closet with other
equipment. To install, attach the mounting brackets to the switch's side panels (one on each side) and secure them
with the screws provided (please note that these brackets are not designed for palm size switches).
Then, use the screws provided with the equipment rack to mount the switch in the rack.