EasyManua.ls Logo

Dolmar MS-430.4 U - Page 26

Dolmar MS-430.4 U
212 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
26
Operating time
Item
Before
operation
After
refuleling
Daily
(10h)
30h 50h 200h
Before
storage
Corres-
ponding P
Engine oil
Inspect/clean
13
Replace
*
1
22
Tightening parts
(bolt, nut)
Inspect
24
Fuel tank
Clean/inspect
Drain fuel
*
3
25
Throttle lever Check function
Stop switch Check function
22
Cutting tool Inspect
10
Idle speed Inspect/adjust
18
Air cleaner Clean
23
Spark plug Inspect
24
Cooling air passage and
cylinder ns
Clean/inspect
25
Fuel pipe
Inspect
25
Replace
*
2
Gear-case grease Rell
24
Fuel lter Clean/replace
24
Valve clearance (intake valve
and exhaust valve)
Inspect/adjust
*
2
Carburetor Drain fuel
*
3
25
*1 Perform initial replacement after 20h operation.
*2 For the 200 operating hour inspection, request Authorized Service Agent or a machine shop.
*3 After emptying the fuel tank, continue to run the engine and drain fuel in the carburetor.

Table of Contents

Related product manuals