1601-065-P-12-19
5
MOVING ARM
can
cause vehicle damage,
serious injury or death.
STAY CLEAR
of arm
at all times.
NO:
Pedestrians
Bicycles
Motorcycles
WARNING
Arm Note: Some of the arms need to be wired to the barrier operator.
Refer the specific arm instruction sheet to for wiring instructions.
Octagon arm shown here. Aluminum arm shown here.
MOVING ARM
can
cause vehicle damage,
serious injury or death.
STAY CLEAR
of arm
at all times.
NO:
Pedestrians
Bicycles
Motorcycles
WARNING
Moving Gate Can Cause
Serious Injury or Death
KEEP CLEAR! Gate may move at any time
without prior warning.
Do not let children operate the gate or play
in the gate area.
This entrance is for vehicles only.
Pedestrians must use separate entrance.
CLASS
CERTIFIED TO
CAN/CSA C22.2 NO. 247
CONFORMS TO
ANSI/UL-325
VEHICULAR GATE OPERATOR
HP
53382
MODEL
SERIAL
VOLTS PHASE
AMPS 60 Hz
MAX GATE LOAD
DoorKing, Inc., Inglewood, CA
MOVING ARM
can
cause vehicle damage,
serious injury or death.
STAY CLEAR
of arm
at all times.
NO:
Pedestrians
Bicycles
Motorcycles
WARNING
Moving Gate Can Cause
Serious Injury or Death
KEEP CLEAR! Gate may move at any time
without prior warning.
Do not let children operate the gate or play
in the gate area.
This entrance is for vehicles only.
Pedestrians must use separate entrance.
MOVING ARM
can
cause vehicle damage,
serious injury or death.
STAY CLEAR
of arm
at all times.
NO:
Pedestrians
Bicycles
Motorcycles
WARNING
1.1 Underground Conduit Requirements
SECTION 1 - INSTALLATION
Primary
Operator
Secondary
Operator
The operator
(s) should be installed with the access
door of the operator opposite the traffic lane.
Access Door
Traffic Lane
Access Door
Note: If your installation has the access door(s) facing the traffic
lane, see Section 5.3 (Page 24) to reverse the factory setup.
The conduit requirements are for a typical slide gate operator installation (the secondary operator is shown for
those applications where a secondary operator may be used). The conduit requirements for your application may
vary from this depending on your specific needs.
Use only sweeps for conduit bends. Do not use 90° elbows as this will make wire pulls very difficult and can cause
damage to wire insulation.
DoorKing recommends using 3/4-inch conduit.
Be sure that all conduits are installed in accordance with local codes.
Never run low voltage rated wire insulation in the same conduit as high voltage rated wire insulation.
Elbow
NO
Sweep
YES
Primary/Secondary Interconnection Cable (Dual Operator Application Only)
Sweeps
Concrete Pad
Concrete Pad
3/4 Inch Minimum
Control and/or P.A.M.S. Wires (Low Voltage wire insulation)
Loop Lead-In Wires (Low Voltage wire insulation)
AC Input Power (High Voltage wire insulation)
AC Input Power (High Voltage wire insulation)
Prior to beginning the installation of the barrier gate operator, we suggest that you become familiar with the
instructions, illustrations, and wiring guide-lines in this manual. This will help insure that your installation is
performed in an efficient and professional manner.
The proper installation of the vehicular barrier gate operator is an extremely important and integral part of the
overall access control system. Check all local building ordinances and building codes prior to installing this
operator. Be sure your installation is in compliance with local codes.
Photocell mounted directly under arm for safety, see safety pages in front of manual.