EasyManua.ls Logo

Doosan A2300 - Lubricating System

Doosan A2300
242 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A Series Diesel Engine Air System 111
Exhaust Manifold and/or Gasket -
Replacement
Preparatory Steps:
z Remove the air crossover tube.
z Disconnect the air intake and exhaust
piping.
z Remove the turbocharger and gasket.
12mm
Remove the manifold and gasket.
Clean the sealing surface.
12mm
Install the manifold and gaskets.
Torque Value : 25.5Nm [19 ft-lbs]
Follow the sequence shown in the illustration.

Table of Contents

Related product manuals