Test run without load
Make sure that movement will not cause any danger to the environment or to the crane itself.
Avoid running close to the limit areas.
Check the limit switches manually if possible.
Check the run commands on the keypad display and correct the motor rotating direction. The
arrow rotates clockwise if S1 (fwd/up) is applied, and counter-clockwise if S2 (rev/down) is
applied.
Check the function of the speed sensor.
Check the function of the speed supervision circuit.
Run forward (upwards) at minimum speed for 5 to 10 seconds. Accelerate to full speed. Run 5 to
10 seconds. Stop. Repeat the same in the reverse (down) direction. Check the frequency
display to make sure that the frequency changes through the whole operational frequency range
from the minimum to the nominal speed.
Check the motor operation (acceleration, deceleration and braking): accelerate to full speed
forward (up), change to full speed reverse (down) and full speed forward (up) again and stop.
Check the limit switch functions: run forward (up) slowly and check the slowdown and the stop
limit switch operations. Re-check using full speed. Repeat the same check for the reverse
(down) direction.
If the optional ESR is used, check the maximum frequency.
Test run with load
Note, three loads are required:
Nominal load (100%) for normal operation.
Limited load for ESR (optional).
An adequate extra load for dynamic overload testing and to test the ESR load limit.
See the maintenance instruction HU1.03.0004 “Erection, Installation and Testing of EOT cranes
for the details of the load tests.
Make sure that movement will not cause any danger to the environment or to the crane itself.
If the optional extended speed range (ESR) is used, check that the load limit is correctly set and
hoisting with bigger loads is prevented.
Run in both directions at minimum and maximum speeds.
If the fan tube resistor unit is included, check that the fan(s) starts to blow when running down
with nominal load and continues to blow for about 4-5 minutes after stopping.
After the test run
Record all the parameter value changes in the parameter list.
Make sure all remarks and setting values are recorded.