Installation, Operation and Parts Manual
EE-6435B .WF
Step 12: Adjust cable slack protection limit switches.
Make the platform be locked at height of 800mm and adjust the limit switch as showed in the following drawing with hex socket spanner
(3mm)
Step 13: Fix the expansion bolts
Refer to 3.3 and adjust the distance between posts before drilling holes for expansion bolts.
Step 14: Leveling steps for the secondary lift
1. Turn on the power switch and turn the selection switch to the “main lift”. Push the “UP “button until the platform of the main lift rises about
1meter above the ground. (This is to find the leveling valve under the secondary platform of the main lift)
2. Find the leveling valve under the secondary platform of the main lift and turn on the valve (valve handle at vertical position, see the above
picture)
3. Turn the selection switch to the “secondary lift” and push the UP button until its secondary platform starts to rise.
4. Turn off the leveling valve and push the UP button unit the two platforms of the secondary lift are at the same level.
5. Normally, platforms of the secondary lift are synchronized after step 4. IF not, please repeat the above leveling steps unit both platforms
work synchronously.