Installation, Operation and Parts Manual
EE-6435B .WF
4.4. Items to be checked after installation
Are the posts vertical to the floor?
Are the oil hoses well connected?
Are the steel cables well connected?
Are two platforms well connected?
Are electrical connections right?
Are the rest joints firmly screwed?
Are all items that need lubricating greased?
OPERATION INSTRUCTIONS
5.1 Precautions
5.1.1 Check all connections of oil hose. Only when there is no leakage, the lift can start work.
5.1.2 The lift, if its safety device malfunctions, shall not be used.
5.1.3 It shall not lift or lower an automobile if its center of gravity is not positioned midway of the runways. Otherwise, we as well as our
dealers will not bear any responsibility for any consequence resulted thereby.
5.1.4 Operators and other personnel concerned should stand in a safety area during lifting and lowering process.
5.1.5 When runways being raised to the desired height, switch off the power at once to lock the button with a padlock to prevent any wrong
operation done by unconcerned people.
5.1.6 Make sure the safety lock of the lift is engaged before start working under the vehicle and no people under the vehicle during lifting and
lowering process.