EasyManua.ls Logo

Eagle T20CF - Operation; Standard Operation; Case Erection

Eagle T20CF
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 6 -
4. Operation
4.1 Standard Operation
Prior to operating the machine, please confirm that
1. The proper voltage is being supplied to the motor
2. All fasteners and protective covers are securely in place
3. All electronic components are dry
Machine Operation
1. Plug the machine into the power source
a. DO NOT hard wire the machine to the power source
2. Turn on air supply.
3. Feed cartons to be erected into storage tray
4.2 Case Erection
1. Adjust the machine for the size of the cartons to be erected.
2. Place the cartons on the carton storage shelf.
3. Machine will place carton, fold front and rear lower flaps, fold left and right lower flaps, and seal
bottom of the carton.

Related product manuals