Eaton 9395XC UPS 1200kW/1200kVA, 1350kW/1350kVA or 1500kW/1500kVA 164001079—Rev 01 51
Figure 23. UPS Intercabinet Power Terminal Locations
ISBM/PM Section Left Side View
Intercabinet power
terminal locations.
Entry for
Ground Wires
Two brackets hold busbars
in the ISBM/PM section
until the connection with
I/O section is made.
Brackets are removed
after connection.
E1, Input
E2, Input
E3, Input
E6, Bypass
E11, Output
+ E4, DC
- E5, DC
E10, Output
E9, Output
E7, Bypass
E8, Bypass
I/O Section Right Side View (Looking in)
Entry for
Misc. Control Wires
3. Locate the AC and DC input inter-cabinet power wiring harnesses - long cables labeled (color):
AC Input
E1 (A, black)
E2 (B, red)
E3 (C, blue)
AC Output
E9 (A, black)
E10 (B, red)
E11 (C, blue)
Bypass
E6 (A, black)
E7 (B, red)
E8 (C, blue)
DC
E4 (+) (Red)
E5 (-) (Black)
4. Locate the inter-cabinet wiring terminal hardware kit packed on the bottom right side of the ISBM section.
5. Using hardware from the inter-cabinet wiring terminal hardware kit (see Table 7), connect phase A, B, and
C cable lug connections to the I/O AC Input terminals. Follow the callout details in Figure 23 to connect the
correct cable lug to the proper terminals. See paragraph 3.2.4 UPS System Power Wiring Preparation for
wiring and termination requirements.
UPS System Installation