Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07 85
CChhaapptteerr 77 UUPPSS OOppeerraattiinngg IInnssttrruuccttiioonnss
This section describes how to operate the UPS.
NOTE 1 Before starting the UPS, ensure all installation tasks are complete and a preliminary
startup has been performed by authorized service personnel. The preliminary startup
verifies all electrical interconnections to ensure the installation was successful and the
system operates properly.
NOTE 2 Read this section of the manual and have thorough knowledge of UPS operation before
attempting to operate any of the controls.
77..11 UUPPSS CCoonnttrroollss aanndd IInnddiiccaattoorrss
The controls and indicators identified and described in this section are used to set up, control, and monitor UPS
operation. Figure 47 shows the control panel location on the front door of the UPS. For a description of the UPS
control panel functions, and how to control and monitor UPS operation., see paragraph
7.2 Using the Control Panel.
Figure 47. UPS Controls and Indicators
Control Panel
Door Latch
Upper Front Door View
77..22 UUssiinngg tthhee CCoonnttrrooll PPaanneell
The following paragraphs describe the UPS control panel, including controls and indicators, and how to monitor
UPS operation. The control panel is shown in Figure 48.