EasyManuals Logo

Eaton 93PM Series User Manual

Eaton 93PM Series
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #5 background imageLoading...
Page #5 background image
Eaton 93PM UPS 480V Three-Wire 100 kW Frame Installation and Operation Manual 164000227—Rev 07 v
TTaabbllee ooff CCoonntteennttss
11 IInnttrroodduuccttiioonn....................................................................................................................................................................................................................................................................................................11
1.1 UPS Standard Features ................................................................................................................................1
1.1.1 Installation Features ..............................................................................................................................1
1.1.2 Control Panel ....................................................................................................................................... 3
1.1.3 Customer Interface ...............................................................................................................................3
1.1.4 Energy Saver System Mode....................................................................................................................3
1.1.5 Internal Redundancy.............................................................................................................................. 3
1.1.6 UL 924 Auxiliary Lighting and Power Equipment Certification .........................................................................3
1.1.7 Advanced Battery Management...............................................................................................................3
1.2 Options and Accessories.............................................................................................................................. 4
1.2.1 Integrated Battery Cabinet...................................................................................................................... 4
1.2.2 Integrated Accessory Cabinet-Distribution.................................................................................................. 4
1.2.3 Integrated Accessory Cabinet-Power Distribution ........................................................................................4
1.2.4 Sidecar Integrated Accessory Cabinet-Bypass............................................................................................. 4
1.2.5 Sidecar Integrated Accessory Cabinet-Tie .................................................................................................. 5
1.2.6 Sidecar Integrated Accessory Cabinet-Tie Bypass........................................................................................5
1.2.7 Integrated Accessory Cabinet-Tie.............................................................................................................5
1.2.8 Parallel System .................................................................................................................................... 5
1.2.9 Top Entry Wiring Sidecar ........................................................................................................................5
1.2.10 Monitoring and Communication .............................................................................................................5
1.2.11 Additional Output Surge Protection ......................................................................................................... 6
1.3 Battery System ..........................................................................................................................................6
1.4 Basic System Configurations.........................................................................................................................6
1.5 Using This Manual ...................................................................................................................................... 6
1.6 Conventions Used in This Manual .................................................................................................................. 7
1.7 Symbols, Controls, and Indicators ..................................................................................................................7
1.8 For More Information ..................................................................................................................................8
1.9 Getting Help ..............................................................................................................................................9
1.10 Equipment Registration..............................................................................................................................9
22 SSaaffeettyy WWaarrnniinnggss.................................................................................................................................................................................................................................................................................... 1111
33 UUPPSS IInnssttaallllaattiioonn PPllaann aanndd UUnnppaacckkiinngg ........................................................................................................................................................................................................................ 1133
3.1 Creating an Installation Plan ........................................................................................................................ 13
3.2 Preparing the Site ..................................................................................................................................... 13
3.2.1 Environmental and Installation Considerations .......................................................................................... 13
3.2.2 UPS System Power Wiring Preparation ................................................................................................... 24
3.2.3 External Parallel UPS System Power Wiring Preparation.............................................................................. 25
3.2.4 UPS System Interface Wiring Preparation ................................................................................................ 35
3.3 Inspecting and Unpacking the UPS Cabinets .................................................................................................. 37

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton 93PM Series and is the answer not in the manual?

Eaton 93PM Series Specifications

General IconGeneral
TopologyDouble conversion online
Form FactorModular
Frequency50/60 Hz
Power Factor0.99
Operating Temperature0°C to 40°C
Relative Humidity0-95% non-condensing
EfficiencyUp to 97% in double conversion mode, 99% in ESS mode
CommunicationRS-232, USB, SNMP, Modbus
Overload Capability150% for 1 minute
Output Frequency50/60 Hz
Battery TypeVRLA, Lithium-ion
Audible Noise<65 dB at 1 meter
Protection FeaturesOverload, short circuit, over temperature
Input Voltage208V, 480V
Output Voltage208V, 480V
Storage Temperature-15 to 50°C (5 to 122°F)

Related product manuals