Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07 51
44..1111 IInnssttaalllliinngg IInntteerrffaaccee CCoonnnneeccttiioonnss
NOTE If installing the IAC-D CT wiring, refer to the Eaton 93PM Integrated Accessory Cabinet-
Distribution (50 kW, 100 kW, 150 kW, and 200 kW IAC-D) Installation and Operation
Manual, listed in paragraph 1.8 For More Information, for installation instructions.
Use the procedures in the following paragraphs to connect the customer and battery interface connections.
44..1111..11 IInnssttaalllliinngg BBuuiillddiinngg AAllaarrmm aanndd RReellaayy CCoonnttaacctt CCoonnnneeccttiioonnss
NOTE 1 If installing interface wiring connections between standalone cabinets or separate
devices, conduit must be installed between each cabinet or device.
NOTE 2 Disconnect terminal block plugs from terminal blocks to wire plugs.
To install wiring:
1. Verify the UPS system is turned off and all power sources are removed. See
Chapter 7 UPS Operating Instructions, for shutdown instructions.
2. If not already opened, open the front door by lifting the latch from the bottom and turning to the right
(counterclockwise) and swing the door open.
3. If wiring the interface terminals from the bottom of the UPS, proceed to Step 8; otherwise, proceed to
Step 4.
4. Top Entry Wiring. Remove the top interface entry conduit landing plates to drill or punch holes (see
Figure 17).
5. Reinstall the interface entry plates and install the conduit.
6. Route the UPS building alarm and relay output interface wiring through the top interface entry conduit
landing plates to the UPS building alarm and relay output terminals. See Figure 22 and Figure 23 for UPS
interface terminal locations.
7. Proceed to Step 13.
8. Bottom Entry Wiring. Remove the bottom interface entry conduit landing plates to drill or punch holes
(see Figure 18).
9. Reinstall the interface entry plates and install the conduit.
10. Route the UPS building alarm and relay output interface wiring through the bottom interface entry conduit
landing plates to the bottom access interface wiring channel along the inside of the front door (see
Figure 24).
11. Route the wiring along the interface wiring channel to the UPS building alarm and relay output terminals.
See Figure 22 and Figure 23 for UPS interface terminal locations.
12. Secure the wiring to the wire tie anchors provided (see Figure 25) using Zip ties.
13. Connect the building alarm interface wiring to the building alarm terminals. See paragraph
3.2.4 UPS System Interface Wiring Preparation and Table 13 for wiring and termination requirements, and
Figure 26 for terminal assignments.
14. Connect the relay output interface wiring to the relay output terminals. See Table 14 for wiring and
termination requirements, and Figure 27 for terminal assignments.
15. If wiring battery detect connections, proceed to paragraph
4.11.2 Installing Battery Detect Interface Connections; if wiring battery shunt trip connections, proceed to
paragraph 4.11.3 Installing Battery Shunt Trip Interface Connections; if wiring generator interface
connections, proceed to paragraph 4.11.4 Generator Interface Connections; if wiring external parallel CAN
connections, proceed to paragraph 4.11.5 Installing External Parallel CAN Control Wiring and Connections;
UPS System Installation