EasyManua.ls Logo

Eaton 9E - Figure 4-1. Removing the Front Shipping Bracket

Eaton 9E
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UPS System Installation
4-2 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality
Figure 4-1. Removing the Front Shipping Bracket
5. Remove four bolts securing the rear shipping bracket to the cabinet and four bolts securing the bracket to
the pallet (see Figure 4-3). Remove the rear shipping bracket. If installing the cabinet permanently, retain
the shipping bracket and securing hardware for later use.
WARNING
Do not stand directly in front of the pallet while unloading the cabinet. If unloading instructions are
not closely followed, the cabinet may cause serious injury.
6. Slowly roll the cabinet toward the front of the pallet. Continue rolling the cabinet down the ramp until the
cabinet is clear of the ramp (see Figure 4-4).
7. Roll the cabinet to the final installation location.
Front Door
Front Shipping Bracket
Shipping Bracket
Bolts
Shipping Bracket
Bolts
Pallet

Table of Contents

Related product manuals