EasyManua.ls Logo

Eaton 9E - Figure 6-9. REPO Operation

Eaton 9E
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UPS Operating Instructions
6-18 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality
2. To deactivate the REPO switch in preparation for restarting the UPS, insert the supplied key and rotate
clockwise until the red pushbutton releases (see Figure 6-9). To remove the key, rotate the key back to the
vertical position.
3. Restart the UPS by following the procedure in paragraph 6.3.1 or 6.3.2.
WARNING
Power is present inside the UPS cabinet after the upstream input feeder circuit breakers are
opened because of the installed internal batteries.
Figure 6-9. REPO Operation
Activated
Pushbutton locked into place
Deactivated
Unlock pushbutton to release

Table of Contents

Related product manuals