Eaton 9PX Lithium-Ion User Guide DPD-9PX2206—Rev 01 19
33..88 PPoowweerr CCaabblleess CCoonnnneeccttiioonn
AAcccceessss ttoo TTeerrmmiinnaall BBlloocckkss
1. Remove the terminal blocks cover (one screw)
2. Punch the knockouts and insert the cables/conduits inside
High leakage current. Earth connection essential before connecting supply.
NOTE The L6-30P input power cable is attached by Eaton.
This type of connection must be carried out by qualified electrical personnel.
Before carrying out any connection, check that the upstream protection device (Normal AC source) is open "O"
(Off). Always connect the ground wire first
If you ordered a HotSwap MBP or a PPDM, refer to the specific user manual to check the terminal blocks
connection of the UPS with this accessory.
OUTPUT
NORMAL AC SOURCE
L1L1
N(L2) N(L2)
Insert the Normal AC cable through the cable
gland.
Connect the three cables to the Normal AC source
terminal blocks.
Insert the Output cable through the cable gland.
Connect the three cables to the Output terminal
blocks.
Put back and secure the terminal blocks cover
with the screw.
Tighten the cable glands.
1
2
3
4
5
6
33..99 DDeetteeccttiinngg OOtthheerr AAcccceessssoorriieess
Tip If you ordered other UPS accessories, refer to specific user manuals to check the connection to the UPS.
Power Cables Connection