4 Construction and Function
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
SKU CG-S 1x6A
Fuses
On the front panel of the change-over module there are
3 output fuses 10 AT / 250 V.
The nominal current should not exceed 6 A!
Fuse dimensions: 6.3 mm x 32 mm, sand filled.
Order no.: 400 71 070 715 / 10 qty./unit
Indicators
ON LED
The LED lights up when the voltage is present at the output
terminals.
Fault LED
The LED lights up when one or more luminaires are faulty.
Operation elements
Service-PIN
Beside the „Service“ lable there is a button which must be
operated when the system´s basic program is loaded. The
basic programming occurs factory made.1)
Additional Features
Mixed operation of
maintained light, non-maintained light and switched maintained
light in one circuit by using of CEAG EVGs/modules with CG-S
marking can be programmed without any additional data cable.
Individual monitoring of up to 20 luminaires per circuit
Separate fusing for mains and battery operation
Among unipolar earth connection in AC operation fault
free DC operation can continue
Easy access fo fuses
Separate savings for mains and battery operation
Connected rating per circuit 1320W
Inrush current per circuit 250A/ms
1 )
When the Service Pin is operated the module status is shown
as a plain-language readout on the display of the CU CG-S control
module. Repeated operation of the SKU´s Service Pin takes the
operator through the following menu structure of the CU CG-S
control module.
ATTENTION!
Only fuses approved by CEAG
Notlichtsysteme GmbH are permitted to
use.
1
2
3
4
1
2
3
4
NOTE
The new SKU modules for the system ZB-S have the ability,
also during breakdown of the controller CU CG-S, to achieve
the following switching functions:
Mains emergency operation (by breakdown CU CG-S)
DC-operation (by power failure)
back to the mains emergency operation (return of the
mains supply). Admittely, will be no switching functions
performed (e. g. by DLS module) during the breakdown
of controller!
By disconnected saving of the mains and battery circuits is
a fault-free DC-operation possible, also when the AC-mains-
supply breakdown by earth fault or short-circuit.
The SKU modules for ZB-S system are Pin-compatible with
the modules of the ZB96 system and EURO ZB.1 system.
ATTENTION!
By replacement of a SKU with older version against a SKU
with innovater version, note that (because of increased
rated current values) accordingly higher fuses are used
per circuit (faulted circuit impendance acc. to DIN VDE
0100)!