EasyManua.ls Logo

Eaton EX EXB - 2.2 Installation of the RT model in tower position; 2.3 Installation of the RT model in a rack

Eaton EX EXB
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34008097EN/AE - Page 10
2. Installation
2.2 Installation of the RT model in tower position
2.3 Installation of the RT model in a rack
It is advised to install the battery EXB module(s) at the lowest position in the rack, then install the UPS above.
Follow steps 1 to 4 for module mounting on the rails.
The rails and necessary hardware (37) are supplied by EATON.
3
2
4
2
4
1
1
1
1
34008097EN_AE.fm Page 10 Mardi, 2. décembre 2008 10:09 10

Table of Contents

Related product manuals