EasyManua.ls Logo

Eaton Power Xpert 9395 - Page 116

Eaton Power Xpert 9395
269 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201725—Rev 15 93
44..1122 IInniittiiaall SSttaarrttuupp
Startup and operational checks must be performed by an authorized Eaton Customer Service Engineer, or the
warranty terms specified in 1.9 Warranty become void. This service is offered as part of the sales contract for
the UPS. Contact an Eaton service representative in advance (usually a two-week notice is required) to reserve
a preferred startup date.
44..1133 CCoommpplleettiinngg tthhee IInnssttaallllaattiioonn CChheecckklliisstt
The final step in installing the UPS system is completing the following Installation Checklist. This checklist
ensures that you have completely installed all hardware, cables, and other equipment. Complete all items listed
on the checklist to ensure a smooth installation. Make a copy of the Installation Checklist before filling it out,
and retain the original.
After the installation is complete, an Eaton Customer Service Engineer must verify the operation of the UPS
system and commission it to support the critical load. The service representative cannot perform any
installation tasks other than verifying software and operating setup parameters. Service personnel may request
a copy of the completed Installation Checklist to verify all applicable equipment installations have been
completed.
NOTE The Installation Checklist MUST be completed prior to starting the UPS system for the
first time.
UPS System Installation

Table of Contents

Other manuals for Eaton Power Xpert 9395

Related product manuals