Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201725—Rev 15 107
55..55 IInnssttaalllliinngg aann OOppttiioonnaall RReellaayy IInntteerrffaaccee MMoodduullee IIII
To install RIM II wiring:
1. Verify the UPS system is turned off and all power sources are removed. See
Chapter 7 UPS Operating Instructions for shutdown instructions.
2. Perform the procedure listed in paragraph
5.2 Installing an Optional Powerware Hot Sync CAN Bridge Card.
NOTE If mounting to a hollow wall, secure the enclosure to a wood or metal stud within the
wall. Do not use hollow wall anchors.
3. Securely mount the RIM II at the desired location. See Figure 69 for mounting hole locations.
NOTE When installing signal wiring for CAN card J3 terminals, conduit must be installed
between the device and the UPS cabinet.
4. Remove the UPS cabinet top interface conduit landing plates to drill or punch conduit holes (see Figure 40).
5. Reinstall the conduit landing plate.
6. Install conduit between the UPS and RIM II. See Figure 69 for RIM II knockout hole location.
7. Install wiring between the UPS and RIM II. See Figure 58 and Table 25 for the Powerware Hot Sync CAN
Bridge Card terminal location and wiring information, and , Figure 64, and Table 29 for the RIM II terminal
location and wiring information.
NOTE 120 Vac for the RIM II should be supplied from the critical bus by facility planners or the
customer.
8. Install 120 Vac power wiring from the critical bus to the RIM II. See , Figure 64, and Table 29 for the
terminal location and wiring information.
9. Close the front door and secure the latch.
10. Restart the UPS. See Chapter 7 UPS Operating Instructions for startup instructions.
NOTE Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an
authorized Eaton Customer Service Engineer. Contact an Eaton service representative
to schedule a date.
11. Contact an Eaton service representative for verification and testing of the RIM II and its connections prior
to making connections with J1 through J4 (see Table 30 and Figure 65).
You can order interface cables separately for connecting to the 15–Pin D–Sub Connectors.