INSTALLATION SETUP
EATON Powerware
®
9170
+
UPS (3–18 kVA) User’s Guide S 164201393 Rev C www.powerware.com
17
Use mounting hardware supplied with the floor anchor kit to attach the
brackets to the UPS or external battery cabinet (see Figure 12). The
customer is responsible for specifying and supplying floor mounting
bolts.
Mounting Centers for 8 mm (5/16”) Floor Bolts
Dimension (see Figure 12) Measurement
A 36.8 cm (14.5)
B (3- and 6-slot cabinets) 76.8 cm (30.25)
B (9- and 12-slot cabinets) 87 cm (34.25)
B
A
Floor Anchor
Bracket
Figure 12. Floor Anchor Brackets Bolted to UPS Cabinet
Moving the Cabinets
CAUTION
Do NOT attempt to raise the cabinet with the power or battery modules installed.
The Powerware 9170
+
UPS and the battery cabinet are very heavy with
power and battery modules installed. Before moving the cabinets,
remove the power and battery modules. Move the modules separately
from the cabinets.
The 3- and 6-slot cabinets may be ordered with a caster cart to enable
moving the cabinet. “Caster Cart Installation (Three- and Six-Slot
Cabinets)” on page 12 describes how to set the four foot pads on this
cart to keep the cabinet from rolling when properly positioned.