EasyManua.ls Logo

EBARA A07V - Page 3

EBARA A07V
69 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(i)
Record of Changes
Rev. Date Page Position Contents Reason
0 2-Jun-94 Newly issued
1 13-Jul-94 5
6-10
14
17
21
22
A07V Spec.
Outline Drawing
Fig. 3.4
Fig. 4.2
Fig. 4.6
Table 4.5
Pumping Speed
Water Sup./Rtn
Sys. Flow
Coupler
Ctrl. Wiring
Pin Assign.
Correction
Add NPT
Add Note
Add Drawing
Correction
Add note
2 14-Nov-96
,
, ,
4
21
25
26
33
35,36
37
44,45
Fig. 1,2,3,4,5
Drawing
3.3 List
Dig. 4.4
Table 4.6
Fig. 4.7
Table 6.1
6.3
7 (8)
9
Safety warning
labels
Warning label
Location
Detailed
specifications
Power Sup. Rec
Dipswitch
S.W setting
Typical check
items
Spare Parts
Pump Lifting
Service Net.
Add
Add
Add List
Correction
Design Change
Design Change
Add Table
Add List
Add Note
Add List
A 12-Dec-97 New release
per ECO 2905
3 20-May-99 21
44,45
5,6,18,
27,28,
32
Tab. 4.2
9. Service Network
-----
Suitable wire
Japan, Taiwan
(Add., Phone, Fax)
The Unit was
changed in terms
of Domestic
regulation for
Measurement low.
Correction
Change
-----
3A 27-Apr-01 ETI release of
EC Rev 3 per
ECO 5394.
3B June 2002 20
iv
Thruout
Add UL grounding
note
Add LCD “hot
surface” note
Add appendices
Language Edit
Third-party
marking
Third-party
marking
SEMI S2
ECO 5771
EBARA Corporation

Related product manuals