SPECIFICATIONS PPF-225
48 X7507820701
© 09/19 ECHO Incorporated
Some tree sap and resins are corrosive. Thoroughly wash the guide
bar and sprocket areas after each use, then coat metal parts with light
oil.
4. Perform all periodic lubrication and services that are required.
5. Tighten all the screws and nuts.
6. Drain fuel tank completely. Press purge bulb 6–7 times to remove
remaining fuel from carburetor then drain the tank again. Close choke,
start and run the engine until it stops due to lack of fuel.
7. Allow engine to cool. Remove the spark plug lead from the spark plug.
Remove the spark plug. Pour 7 cc (0.25 oz.) of fresh, clean, two-stroke
engine oil into the cylinder through the spark plug hole.
8. Pull the recoil starter handle 2-3 times to distribute the oil inside the
engine.
9. Observe the piston location through the spark plug hole. Pull the recoil
handle slowly until the piston reaches the top of its travel and leave it
there.
10. Install the spark plug. Connect the spark plug lead to the spark plug.
SPECIFICATIONS
MODEL PPF-225
Length 2,398 mm (94.4 in.)
Width 251 mm (9.88 in.)
Height 236 mm (9.29 in.)
Weight (dry) 6.8 kg (15.1 lb.)
Engine Type
Air cooled, two-stroke, single cylinder gasoline
engine
Bore 32.2 mm (1.27 in.)
Stroke 26.0 mm (1.02 in.)
Displacement 21.2 cc (1.29 cu. in.)
Exhaust
Spark arrestor muffler or spark arrestor muffler with
catalyst
Carburetor Diaphragm w /purge pump
Ignition System Flywheel magneto, capacitor discharge ignition type
Spark Plug NGK BPMR8Y (Gap 0.65 mm [0.026 in.])
Fuel Mixed (Gasoline and Two-stroke Oil)