CH/SE/SU
Page Block No. Description of Change
34-50-21
PgBlk 501 Adjustment/Test - Added ADS-B Out check. Added antenna coupler to test.
34-50-21
PgBlk 401-Inst Installation - Revised Job Set-Up.
34-50-23
PgBlk 401-Inst Installation - Revised Job Close-up test reference.
34-50-26
PgBlk 401-Rem Removal - Added ADS-B Fail Indicator Removal procedure.
34-50-26
PgBlk 401-Inst Installation - Added ADS-B Fail Indicator Installation procedure.
EA500 Aircraft Maintenance Manual — 06-117751
Temporary Revision No. 34-21
34-HIGHLIGHTS
Page 3
Sep 30/20
© 2020 Eclipse Aerospace, Inc.