6. Job Close-Up
SUBTASK AMM-34-40-50-071-B-921-002
A.
If no other work is to be performed, turn off the aircraft power by setting the SYS BATT
and START BATT Switches to the OFF (down) position, and the BUS TIE to OPEN
(down) position.
B. If there are no other requirements for External Power, disconnect External Battery Pack
from the aircraft EXTERNAL POWER RECEPTICLE.
C. Install (if removed) 331 DT - Upper Overfin Fairing. Refer to AMM-06-50-00-051-801 –
Aircraft Access Panels for location and installation instructions.
D. Remove all tools, equipment, and unwanted material from work area. If all other
maintenance is complete, return aircraft to service. Refer to AMM-20-00-02-051-801 –
Return To Service (After Maintenance).
EA500 Aircraft Maintenance Manual — 06-117751
Temporary Revision No. 34-21
EFFECTIVITY: 0001 - 0008, 0010 - 0050, 0052, 0054 -
0267 POST SB 500-31-024
34-40-50
CONFIG B
Page 510
Sep 30/20
© 2020 Eclipse Aerospace, Inc.