EasyManua.ls Logo

Ecosoft MO6500BWTSS - 4 Installation Requirements; 5 Operating Requirements

Ecosoft MO6500BWTSS
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
This manual is the intellectual property of Ecoso. Copying and reprinng is prohibited. © 2021
9
INSTRUCTION MANUAL ECOSOFT RO SYSTEM
MO6500BWTSS
4. INSTALLATION REQUIREMENTS
Installaon and setup of the unit should be undertaken by a qualied professional. Room
or area where the unit is to be installed must meet workplace standards of local building code.
The unit must not be operated in outdoor environments. Do not expose to weather
condions (rain, temperature uctuaons, proximity of heang equipment, direct sunlight etc).
Air at workplace should be free of corrosive vapors, airborne dust, and brous maer.
To provide access to the unit for maintenance and repair purposes, respect the following
clearances between the unit and building structures: 500 mm to the le or right, 200 mm above.
Electrical connecons must comply with local electrical code. Make sure to follow
applicable grounding and insulaon rules.
Supply, drain, and delivery pipework must comply with local plumbing code and have
sucient ow capacity. Drain line of the unit must be separated from oor drain with an air gap.
Construcon material or inside lining of permeate tank must be resistant to water
corrosion (e. g. stainless steel, polypropylene). Tank should be installed next to the unit.
Anscalant pump sucon line length should not exceed 1.5 m. Refer to dosing pump’s
manual to adjust pump’s sengs if it has not been factory congured.
5. OPERATING REQUIREMENTS
5.1 Operator of the unit must strictly follow these guidelines and general electrical safety
precauons.
5.2 When operang the unit, ensure that pressure and ow rates are within specicaon
limits and that power supply is clean and uninterrupted.
5.3 Perform the following at least once a month:
verify that pressure and ow rate parameters have not deviated (substanally);
verify ghtness (absence of leaks) from connecons and visual integrity of parts.
5.4 In order to monitor performance of the RO machine, regularly keep record of
operaon and write down parameter readings. Use membrane manufacturer’s soware tools for
normalizaon to control for uctuaons of pressure, temperature, and other operang condions.
5.5 Change polypropylene cartridge when it has clogged. Pressure drop of 0.1 MPa or greater
on the sediment lter indicates that lter cartridge needs to be replaced as soon as possible.
If power supply cable or any other electrical wiring is damaged, it must be replaced by a
vendors service sta or similarly qualied person.

Related product manuals