E F A P O W E R E V - PC - I N S T A L L A T I O N A N D U S E R M A N U A L
13 | 37
Connection between Central and Satellite Units – only communications (if applicable):
▪ Ethernet patch cable STP CAT5e TIA/EIA-568B
Tools:
▪ Screwdriver - for fixing the Unit on the wall
▪ 13mm socket and wrench - for fixing the Unit to the floor
▪ Crimping tool - for power and earth cables
▪ Torque screwdriver with flat blade - for input terminal blocks
5.2.4 SITE VERIFICATION AND INSPECTION
✓ Check if Public Charger has the appropriate upstream protection depending on the configuration.
✓ Check if the surface where the Public Charging Station will be placed is leveled as specified.