EasyManua.ls Logo

Electrolux Prostore PS06R1F - Maintenance Intervals; Maintenance Frequency; Disassembly

Electrolux Prostore PS06R1F
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
91
ENGLISH
D.1.3 Maintenance intervals
The inspection and maintenance intervals depend on the
actual machine operating conditions and ambient condi-
tions (presence of dust, damp, etc.), therefore precise time
intervals cannot be given. In any case, careful and periodical
machine maintenance is advisable in order to minimise ser-
vice interruptions.
It is advisable to stipulate a preventive and scheduled
maintenance contract with the After-Sales Service.
D.1.3.1 Maintenance frequency
To ensure constant machine eciency, it is advisable to carry
out the checks with the frequency given in the following table:
Maintenance, inspections, checks and cleaning Frequency
Routine cleaning
general cleaning of machine and surrounding area
daily
Mechanical protection devices
check their condition and for any deformation,
loosening or removed parts
monthly
Control
check the mechanical part, for cracks or
deformation, tightening of screws: check the
readability and condition of words, stickers and
symbols and restore if necessary
yearly
Machine structure
tightening of main bolts (screws, xing systems, etc.)
of machine
yearly
Safety signs
check the readability and condition of safety signs
yearly
Electrical control panel
check the electrical components installed inside the
electrical control panel. Check the wiring between
the electrical panel and machine parts.
yearly
Electrical connection cable and plug
check the connection cable (replace if necessary)
and plug
yearly
General machine overhaul
check all components, electrical equipment,
corrosion, pipes…
every
10years*
(*) the machine is designed and built for a duration of about
10 years. After this period of time (from commissioning) the
machine must undergo a general inspection and overhaul.
Some examples of checks to be carried out are given below.
check for any oxidised electrical components or parts; if
necessary, replace them and restore the initial conditions;
check the structure and welded joints in particular;
check and replace bolts and/or screws, also checking for
any loose components;
check the electrical and electronic system;
check the functionality of safety devices;
check the general condition of protection devices and
guards.
ATTENTION
Maintenance, checking
and overhaul operations
must only be carried out
by a specialised technician
or the After-Sales Service,
provided with adequate
personal protection equip-
ment (safety shoes and
gloves), tools and ancillary
means.
ATTENTION
Work on the electrical
equipment must only be
carried out by a special-
ised electrician or the Af-
ter-Sales Service.
D.1.4 Disassembly
If the appliance has to be disassembled and then reassembled,
make sure the various parts are assembled in the correct order
(if necessary mark them during disassembly).
Before disassembling the machine, make sure to carefully
check its physical condition, and in particular any parts of the
structure that can give or break. Before starting disassembly:
remove all the pieces (if present) in the machine;
disconnect the power supply;
enclose the work area;
place a sign on the Main Electrical Panel indicating that
the machine is undergoing maintenance and not to carry
out manoeuvres;
carry out the disassembly operations.

Table of Contents