Setup
15
3.3.1Castingaplinth
Aplinthshouldbeusedwheretheexistingoorislessthan100mmthickorinordertoensurethat
themachineisabovethelevelofanywaterleakages.
Theplinthshouldbeapproximately150-200mminheight.
⑤
g.5462
Proceedasfollows:
•Breakuptheexistingoortoadepthofapprox.75mmandcheckthatthesidesoftheholeare
taperedoutwardsothatthelongestsideatthebottommeasures120mmmorethanatthetop.
⑥
g.0899
•Makethemouldfortheplinth.
•Moistentheholewellandapplycementtothesidesandbottom.
•4boltsmustbesetintotheconcreteofthemachinebase.Theboltsneedtoproject40mmout
ofthebase.Pourtheconcreteintothepreparedbasemouldandmakesurethatthesurfaceis
level.Checktheprevioustableforthecorrectpositionofthebolts.
•Theconcreteshouldbelefttosetforatleasttwodaysbeforemountingthemachineontheplinth.