Installing Snap-in Rails
This procedure describes how to install the snap-in rails.
Before you begin
The snap-in rails have key tabs. The key tabs are positioned at the rear of the rails. The
key tabs ensure that the rails are installed in the appropriate 2U space.
Rails are dedicated left and right, and cannot be interchanged. Depending upon the
configuration, the left rail may contain a field bezel cord cover. Rails that have this cover
are installed in the same way.
Procedure
1. Align the 2U key tabs with the holes of the U-space in the rear rack channel.
Rack and install
Installing Snap-in Rails 23