GBGB
22
5. FIRST START-UP
5.6 Checking the HP inputs and outputs
a.Press the icon to access the Heat Pump Set screen.
b. Press the icon to access screen 4.2
of the I/O Status.
c. Verification of the PCB TERMINAL BLOCK inputs.
Check if the values displayed on the screen correspond to the
physical status of the inputs in the HP.
R1 out
T1 out
T2 out
L1 out
L2 out
P1 in
P0 in
M1 out
P2 out
W1 out
U1 out
M2 out