Levelflex M FMP40 FOUNDATION Fieldbus Commissioning
Endress+Hauser 27
5Commissioning
5.1 Function check
Make sure that all final checks have been completed before you start up your measuring point:
• Checklist "Post-installation check", → ä 17.
• Checklist "Post-connection check", → ä 22.
5.2 Switching on the measuring device
When the device is switched on for the first time, the following messages appear in a sequence
of 5 s on the display: software version, communication protocoll and language selection.
⇒
Select the language
(this message appears the
first time the device is
switched on)
⇓
Select the basic unit
(this message appears the
first time the device is
switched on)
⇓
The current measured
value is displayed
⇓
After
F
is pressed, you
reach the group selection
This selection enables you
to perform the basic setup
ENDRESS + HAUSER
E
+
–