Commissioning Prosonic T
20 Endress+Hauser
5 Commissioning
5.1 Function check
Make sure that all final checks have been completed before you start up your measuring point:
• Checklist → ä 11 “Installation check”.
• Checklist → ä 14 “Checking the connection”.
5.2 Switching on the measuring device
When the instrument is switched on for the first time, the following messages appear in a
sequence of 5 s on the display: software version, communication protocol and language
selection.
⇒
Select the language
(this message appears the
first time the instrument
is switched on)
⇓
Select the basic unit
(this message appears the
first time the instrument
is switched on)
⇓
The current measured
value is displayed
⇓
After E is pressed, you
reach the group selection.
This selection enables you
to perform the basic setup