Prothermo NMT81 Installation
Endress+Hauser 41
7 Base plate/datum plate
8 Stranded wire
9 Top anchor
For the detailed installation procedure of top anchor, → 33
5.12.2 Stilling well method
Insert a temperature probe and a WB probe into a stilling well that is 50A (2") or larger. The
installation procedure is same for only temperature version.
To prevent damage to temperature probe and WB probe, ensure that they do not touch
anything during insertion through the installation nozzle.