EasyManua.ls Logo

enphase IQ7 - Step 8: Complete the Installation of the Junction Box; Step 9: Connect the PV Modules

enphase IQ7
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IQ7/IQ7+/IQ7X/IQ7A Microinverters Installation and Operation Manual
22 © 2023 Enphase Energy Inc. All rights reserved. September 2023
IOM-00028-1.0
Step 8: Complete the installation of the junction box
A. Connect the IQ Cable to the junction box.
B. Use the ground lug on the IQ Aggregator for module, rack, and balance of system
grounding, if needed.
C. Refer to the wiring diagrams for more information. Wire colors are listed in the following
table.
Wire colors
L1 Black
L2 Red
Step 9: Connect the PV modules
WARNING: Electrical shock hazard. The DC conductors of this photovoltaic system are
ungrounded and may be energized.
A. If required, attach the Enphase DC bulkhead adaptors to the microinverters. Ensure they
are fully seated. Do not reverse the adaptor connections.
B. Connect the DC leads of each PV module to the DC input connectors of the
corresponding microinverter or adapter.
C. Check the LED on the connector side of the microinverter. The LED flashes six times when
the DC power is applied.
D. Mount the PV modules above the microinverters.

Table of Contents

Related product manuals