EasyManua.ls Logo

enphase IQ7 - Page 8

enphase IQ7
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IQ7/IQ7+/IQ7X/IQ7A Microinverters Installation and Operation Manual
8 © 2023 Enphase Energy Inc. All rights reserved. September 2023
IOM-00028-1.0
Ensure
protective sealing caps have been installed on all the unused AC
connectors.
Unused AC connectors are live when the system is energized.
WARNING:
Use the
terminator only once. If you open the terminator following installation, the
latching
mechanism is destroyed. If the latching mechanism is defective, do not
use
the
terminator. Do not circumvent or manipulate the latching mechanism.
Secure any loose cable when installing the IQ Cable to minimize tripping hazards.
NOTE:
When
looping the IQ Cable, do not form loops smaller than 4.75 (12 cm) in
diameter.
Provide support for the IQ Cable every 1.8 m (6 feet).
If you need to remove a sealing cap, you must use the IQ Disconnect Tool.
When
installing the IQ Cable and accessories, adhere to the following:
Do not expose the terminator cap or cable connections to directed,
pressurized liquid (water jets, and so on).
Do not expose the terminator or cable to continuous immersion.
Do not expose the terminator cap or cable connections to continuous
tension (for example, tension due to pulling or bending the cable near the
connection).
Use only the connectors provided.
Do not allow contamination or debris in the connectors.
Use the terminator cap and cable connections only when all parts are
present and intact.
Do not install or use in potentially explosive environments.
Do not allow the terminator to come into contact with an open flame.
Fit the terminator cap using only the prescribed tools and in the
prescribed manner.
Use the terminator to seal the conductor end of the IQ Cable; no other
method is allowed.

Table of Contents

Related product manuals