EasyManua.ls Logo

Entrematic Ditec DAS200HD - Routine Maintenance Plan

Entrematic Ditec DAS200HD
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
54
IP2266EN
EN
14. Routine maintenance plan
Perform the following operations and checks every 6 months, according to the intensity of use of
the automation.
With power supply and batteries disconnected:
- Clean and lubricate the mobile parts (the carriage slide guides and the floor guides).
- Check the belt and its tension.
- Clean sensors.
- Check the stability of the automatic system and make sure that all screws are correctly
tightened.
- Check the alignment of the door wings, the position of the end stops, and the correct intro-
duction of the blocking device.
With power supply and batteries connected:
- Check the blocking system is working correctly.
- Check the stability of the automation, and make sure it moves smoothly.
- Check that all control functions are operating correctly.
- Make sure the command and safety sensors are working correctly.
- Make sure the forces developed by the automation meet the requisites of the applicable
regulations.
- Check the correct functioning of the batteries.
NB: for spare parts, see the spares price list.
i
i
Only use original spare parts for repairing or replacing products.
The installer must supply all information concerning the automatic, manual and emer-
gency operation of the motorised automation or gate, and must provide the user with the
operating instructions.
The installer must prepare and keep a maintenance record showing all the routine and
extraordinary maintenance work carried out.

Related product manuals