EasyManua.ls Logo

Envision ENV200 - Page 53

Default Icon
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
P a g e | 53
If the user has failed to calibrate all of the parameters a warning screen will appear and will indicate
“Not all calibrated”.
This is a warning box so that the user can go back and calibrate the remaining parameters, if desired. If
the user taps the “OK” box in the warning message it will return the screen back to the “Calibration
Menu” so that the remaining parameters can be calibrated. If the user does not calibrate the remaining
parameters and taps the “Store Calibration File” button again the unit will store a “Calibration File” but
will place NA in the fields that were not calibrated. Elkins Earthworks® recommends that each
parameter be calibrated at least once during each monitoring event.

Table of Contents