EasyManua.ls Logo

EVBox Audi Wallbox - Prerequisites for Installation

EVBox Audi Wallbox
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
Prerequisites for installation
Your Audi Wallbox pro
comes equipped with a kWh
meter. The 1-phase version
is compatible with 1-phase
and 3-phase kWh meters
but the 3-phase version only
with 3-phase kWh meters,
as shown in the following
table.
Possible
combinations
1-phase
kWh meter
3-phase
kWh meter
1-phase Audi
Wallbox pro
3-phase Audi
Wallbox pro
Choose location
Position the wallbox, where possible, in
surroundings where it is not exposed to
direct sunlight and vulnerable to external
damage. Direct sunlight can cause an in-
crease in wallbox temperature, which may
impact charging performance.
The wall must have a at structure and
must be able to hold a load of at least 100
kg.
The minimum free space around the wall-
box must be a minimum of 300 mm.
Consider the position of the charging port
of the vehicle when choosing the installa-
tion location of the wallbox.
English
Bezel
Front cover x 1
Main assembly x 1
A. Audi Wallbox pro
with kWh meter
B. Audi Wallbox or Audi
Wallbox plus with feed-
through terminals
Wall bracket x 1
Charging cable x 1
HMI cable x 1
RFID cable * x 1
RS485 cable ** x 1
Fastening kit for
main assembly x 1
Fastening screws for
front cover x 1
Safety Instructions and
Quick Installation Guide
x 1
Installation and User
Manual (available online)
Charge card *
1 4
9
2 5
10
11
12
3 6
7
8
* For Audi Wallbox plus and Audi Wallbox pro only.
** For Audi Wallbox pro only.
Danger
Working on electric installations without
proper precautions will result in the risk
of electric shock, which will cause severe
injury or death.
Make sure that connection of the elect-
rical power cannot occur during instal-
lation.
Put up caution tape and warning signs
to mark the working areas. Make sure no
unauthorized persons enter the working
areas.
13