174
FUEL SYSTEM
FUEL COMPONENT SERVICING
Place gasket on throttle body. Install throttle body
on reed plate and install screws.
Tighten the center screws first and expand out-
ward. Final torque is 60 to 120 in. lbs. (7 to 13.5
N·m).
Install upper main bearing vent hose and secure
with tie strap.
Connect throttle linkage and electrical connectors.
IMPORTANT: Refer to TPS Calibration on
p. 143.DO NOT lubricate throttle linkages.
002329