. Advanced Brewing and Operational Techniques
It will take about 18 min
the digital display and pressure gau
are up to the set temperature.
we recommend doing 3 separate
brew group and portafilter. To
place your portafilter into the
ise the control lever to the
position and run 4 ounces of
water through it. If the temperature falls below the set point
back up and then repeat this procedure.
After the machine has been on for over 35 minutes
you run 2 ounces of water through the brew group if the machine has been
After the programming the machine to brew at a different temperature
minutes for the boiler temperature to balance out.
ne for brewing and one for steaming
and dispensing hot water.
When the Brewtus is turned on
will automatically fill with water. The brewing boiler must
position until the water is
flowing out of the brew group in a steady stream. When the steam boiler is
the heating element in the steam boiler will be energized and the stea
boiler will start to heat up. Once
heating element in the brewing boile
the small LED on the digital display will flash and wil
display the current temperature of the boiler. The steam boiler will heat in
around 8 minutes and the bre