EasyManua.ls Logo

Extra 300/SC - Page 68

Extra 300/SC
482 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE MANUAL EXTRA 300/SC
CHAPTER 05
PAGE 30
PAGE DATE: 1. August 2014
Front spar section
O 4 Check skin to spar bonding for delamination by coin tapping (refer to
Chapter 20-10-06).
O 5 Detailed visual sheet metal attachment fitting for damage, corrosion
and link bolts security.
Rear spar section
O 6 Check skin to spar bonding for delamination by coin tapping .
O 7 Detailed visual inspection of rear spar web for dents, cracks and
delamination. Pay particular attention to the cut out for rudder canti-
lever.
O 8 Inspect cantilever bearings for play. Check for free movement and
cleanliness.
O 9 Check steel sleeve for secure bonding to the spar.
O 10 Replace attachment bolts and stop nuts. Check for proper torque in
accordance with Chapter 20-10-03.
Root and Tip
O 12 Check root rib for cracks, delamination and secure bonding to skin and
spars by coin tapping.
O 12 Inspect tip rib visually for general condition.
Horizontal Stabilizer
O 1 Remove elevator as per Chapter 27.
Leading edge
O 2 Check surface for erosion, scratches, stone nicks and impact damage.
O 3 Check top to bottom shell bonding for dents, cracks and delamination.
Front spar section
O 4 Check skin to spar bonding for delamination by coin tapping.
Rear spar section
O 5 Check skin to spar bonding for delamination by coin tapping.
O 6 Inspect elevator bracket bearings for play. Check for free movement
and cleanliness.
O 7 Inspect central attachment fitting for cracks, damage and corrosion.
Check for link bolts security.
Inspector:
Mechanic:
Inspections
Date:
Serial No.:
1000 hours
SCHEDULED MAINTENANCE CHECKS
Significant Items Inspection

Table of Contents

Related product manuals